Workflow
Infill Drilling
icon
搜索文档
Osisko Development Provides Infill Drilling Update on Its 13,000-m Program at Cariboo Gold Project; Intercepts Include 8.56 g/t Au Over 8.5m from 60.5m Depth, and 130.32 g/t Au Over 0.5m from 83.5m Depth
Globenewswire· 2025-12-15 21:00
HIGHLIGHTS 5,983 m of infill drilling completed (3,704 m of new results) on 10-m drill spacing in 62 drill holes from August 2025, representing ~44% of the total planned 13,000-m infill program Highlights include: 8.56 g/t Au over 8.5m from 60.5m depth, 16.95 g/t Au over 4.0m from 80m depth (including 130.32 g/t Au over 0.5m from 83.5m depth), and 9.32 g/t Au over 6.0m from 58m depthResults to date continue to be broadly consistent with modelled reserve stopes, indicate potential for upside mineralization i ...