Workflow
DLP Resources Intersects 66m of 0.42% Cu and 4.89g/t Ag Within a 202m Interval of 0.25% Cu and 2.93g/t Ag on the Aurora Project in Southern Peru
SOSouthern Company(SO) Newsfile·2024-06-25 18:00

Drillhole A24-014 was drilled approximately 250m northeast of drillhole A23-013 and intersected copper and silver mineralization throughout the hole to a depth of 641.30m. The hole was stopped at 641.30m due to faulting and fracturing between 273m and 332m and did not get into the planned molybdenum zone at depth. Mineralized intervals are indicated below. 202.00m at 0.25% Cu and 2.93g/t Ag from 107.00m to 309.00m. The complete set of results for A24-014 are summarized in Table 1 below. Mr. Gendall, Preside ...