Dundee Precious Metals Reports High-Grade Intercepts at Dumitru Potok of 131.6 metres grading 3.93% CuEq and 76 metres at 2.47% CuEq
Globenewswire·2025-09-10 18:30
TORONTO, Sept. 10, 2025 (GLOBE NEWSWIRE) -- Dundee Precious Metals Inc. (TSX:DPM) (“DPM”) today reported high-grade copper-gold-silver intercepts from its ongoing Serbian exploration program, including the Dumitru Potok prospect. Results included an intercept of 131.6 metres grading 3.93% CuEq, comprised of 1.53% Cu, 2.41 g/t Au and 12 g/t Ag from 1,126 metres and 76 metres at 2.47% CuEq, comprised of 1.01% Cu, 1.43 g/t Au and 10.37 g/t Ag from 1,277 metres downhole at hole DPDD032. This represents one of t ...