Sitka Drills 121.0 Metres of 0.75 g/t Gold and 26.0 Metres of 1.28 g/t Gold Within 249.9 Metres of 0.58 g/t Gold, Significantly Expanding Mineralization Beyond the Current Resource Boundary at Its Eiger Deposit, RC Gold Project, Yukon
Newsfile·2025-12-02 21:42
Sitka Drills 121.0 Metres of 0.75 g/t Gold and 26.0 Metres of 1.28 g/t Gold Within 249.9 Metres of 0.58 g/t Gold, Significantly Expanding Mineralization Beyond the Current Resource Boundary at Its Eiger Deposit, RC Gold Project, YukonDecember 02, 2025 8:42 AM EST | Source: Sitka Gold Corp.Step out drilling at Eiger continues to return broad intervals of significant gold mineralization beyond the current Mineral Resource Estimate ("MRE") boundary at the Eiger deposit, which remains open in all ...