MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power

Establishes Premier Digital Infrastructure Campus with Over 1 GW of Total Potential Capacity, Including 200 MW of Existing MARA Capacity and Line of Sight to up to 600 Gross MW of AI and Critical IT Loads Increases MARA’s Owned and Operated Capacity by 65% Adds Approximately $144 Million of Annualized Adjusted EBITDA1 at Less than $15/MWh of All-In Operating Costs MARA to Host Conference Call Today at 8:00 a.m. ET (5:00 a.m. PT) Miami, FL, April 30, 2026 (GLOBE NEWSWIRE) -- MARA Holdings, Inc. (NASDAQ: MAR ...

Marathon-MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - Reportify