Workflow
High - grade gold discovery
icon
搜索文档
Goliath Completes Over 64,000 Meters Of Drilling in 110 Drill Holes, With 100% Hit Rate In 90 Days On 1.8 Km2 Surebet Gold Discovery That Remains Open, Golddigger Property, Golden Triangle, B.C.
Globenewswire· 2025-09-23 18:23
With over 64,000 meters drilled in 110 holes with 9 drill rigs turning for most of the season, the 2025 drill program on Surebet has exceeded the planned 60,000 meters. In what is one of the largest helicopter supported drill programs in challenging alpine terrain in North America this year. The 2025 field season will officially come to an end in the next couple of weeks, once all the logging has been completed. Assays are pending for 88 drill holes drilled in 2025.100% of the drill holes completed to date ...
Goliath Intersects Several High-Grade Gold Holes Including 8.45 g/t Au Over 7.13 Meters, Within 5.13 g/t Au Over 12.00 Meters, Drilling Maintains 100% Hit Rate, Surebet Discovery Remains Open, Golddigger Property, Golden Triangle, B.C.
Globenewswire· 2025-09-22 18:22
Infographic 1 Infographic 1 Infographic 2 Infographic 2 Infographic 3 Infographic 3 Infographic 4 Infographic 4 Infographic 5 Infographic 5 Infographic 6 Infographic 6 Infographic 7 Infographic 7 Visible gold to the naked eye “VG-NE” heat map of all holes reported to date 2021 – 2025 (see below). An accompanying infographic is available at: https://www.globenewswire.com/NewsRoom/AttachmentNg/0a12f8b1-aa01-49b0-85d4-7fdb8b347dbf Since drilling started in 2021, many holes have ret ...
Goliath Intersects 10.62 g/t Gold Over 22.82 Meters, Drilling Maintains 100% Hit Rate, 95% Of Holes Contain Visible Gold, Remains Wide Open, Surebet Discovery, Golddigger Property, Golden Triangle, B.C.
Globenewswire· 2025-08-26 18:26
核心观点 - Goliath Resources在Surebet金矿发现区取得突破性钻探成果 钻探见矿率100%且95%钻孔存在肉眼可见金 证实该区域存在连续性强、可预测的高品位金矿系统[6][7][9] - 钻探结果凸显三大岩性包中均存在高品位金矿化 包括缓倾角石英硫化物角砾岩/网状脉、富金RIRG岩脉和钙硅酸盐蚀变角砾岩 表明深部存在母矿岩浆源[11][12][15] - 2025年计划完成6万米钻探 目前已完成45,000米(65孔) 剩余15,000米(50孔) 9台钻机正在作业 55个钻孔样品待分析[9][11] 钻探成果 - GD-25-337孔见22.82米10.60克/吨金 包含15.71米15.19克/吨金 以及3.36米37.28克/吨金(1.20盎司/吨)和3.08米36.11克/吨金(1.16盎司/吨) 金属量达242克*米[9][11][15] - GD-24-277孔见6米12.16克/吨金 包含4米18.22克/吨金 位于强蚀变安山岩单元[8][15] - GD-25-318孔见5.7米11.03克/吨金 GD-25-343孔见5米10.08克/吨金 GD-25-334孔见6米6.85克/吨金 均含大量石英硫化物矿化和肉眼可见金[8][13] 资源规模 - Surebet矿化带沿走向延伸1.8公里 超过纽约中央公园一半面积 目前保持全线开放[11][18] - 已识别12条缓倾角高品位金矿脉 延伸1.2公里 4条RIRG岩脉宽度达25米 地表露头沿走向达1,500米[18] - 地形优势使矿脉在2.1公里走向长度上出露地表(南坡1公里+北坡1.1公里) 垂直高差700米[18] 技术优势 - 选冶回收率达92.2%(重力+浮选) 其中单重力分选回收率48.8% 无需氰化物提金[18][20] - 矿石不含有害元素 岩石组成良性[18][20] - 科罗拉多矿业学院研究确认共同岩浆源成矿机制 为三大岩性包提供成矿理论支撑[18] 项目区位 - Golddigger项目100%控股 面积91,518公顷 位于Eskay裂谷高前景地质区 距"红线"地质接触带仅3公里[19][30] - 基础设施完善 邻近Alice Arm和Kitsault社区 存在已许可选厂址 具备驳船通道(至Prince Rupert190公里)和公路接入[21][22] - 区域拥有Dolly Varden银矿道路(东7公里)、高压电网(东25公里)和Alice Arm驳船登陆点(南18公里)[22] 勘探进展 - 2021-2024年累计钻探92,000米 400个穿透点 建立更新地质模型指导2025年钻探[18] - 目前已完成65孔(45,000米) 95%钻孔含肉眼可见金 100%见石英硫化物矿化[9][18] - 历史最佳孔GD-24-260见39米34.52克/吨金当量 包含10米132.93克/吨金当量 金属量达1346克*米[18]